Optimization of Stope Structure Parameters in E’xi Iron Mine Based on Rock Stress Analysis

Article Preview

Abstract:

Underground mining causes the redistribution of surrounding rock stress. The value of rock stress is one of the important factors that should be considered when stope structure size is designed. E’xi iron ore body is gently declined in attitude, thin in thickness, and large in occurrence area. According to mining technological conditions and the selected mining method of E’xi iron mine, a typical section of the mine is selected, and it is abstracted into a plane strain problem. In terms of optional stope structure parameters, 9 calculation schemes are planed. Rock stress distributions of stope caused by mining are simulated by the Finite Element Method. Rational stope parameters are chosen by comparing stress distributions of all calculation schemes. Analysis result shows that 8m net distance between pillars, and 4m pillar width are the optimum stope parameters, which not only stabilize the stope but also improve mining efficiency. Choosing stope parameters based on rock stress distributions calculated with numerical simulations, is provided a scientific analysis method for determining rational mining parameters of underground mines.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1434-1439

Citation:

Online since:

July 2011

Export:

Price:

[1] X. Wang, B. Zhao and C. Zhang: Mining Research and Development Vol. 28 (2008), pp.9-85.

Google Scholar

[2] J. Butral and W. Pytel: Int. J. Rock Mech. Min. Sci. Vol. 41 (2004), pp.1-6.

Google Scholar

[3] P. Huang, C. Chen, G. Xiao and J. Lin: Rock and Soi1 Mechanics Vol. 30 (2009), pp.3020-3024.

Google Scholar

[4] Z. Chen, P. Yang, W. Lv, R. Meng and G. Yu: Nonferrous Metals Vol. 62 (2010), pp.89-92.

Google Scholar

[5] M. Cai, C. Li, M. Xie and X. Li: Journal of University of Science and Technology Beijing Vol. 30 (2008), pp.109-114.

Google Scholar

[6] K. Li, S. Wu and W. Song: Metal Mine 407 (2010), pp.16-20, 116.

Google Scholar

[7] M. A. Lin' kov: Journal of Mining Science Vol. 37 (2001), pp.10-27.

Google Scholar

[8] Y. Liu, Y. Ye, J. Sheng and Q. Wang: in: 2011 International Conference on Fuzzy System and Neural Computing Proceedings (Volume 6), edited by H. Tan, IEEE Inc., Danvers, (2011), pp.68-72.

Google Scholar

[9] S. Yao and L. Hu: Earth Science —Journal of China University of Geosciences Vol. 24 (1999), pp.344-350.

Google Scholar

[10] J. Yao, G. Zhao, K. Peng and M. Xu: Mining Research and Development Vol. 29 (2009), pp.1-3.

Google Scholar

[11] S. Yin and A. Wu: Metal Mine 378 (2007), pp.10-13.

Google Scholar

[12] J. Yu, X. Huang, D. Wu and P. Ma: Journal of Central South University (Science and Technology) Vol. 36 (2005), pp.1107-1111.

Google Scholar

[13] J. Guo and H. Wang: Metal Mine 404 (2010), pp.18-21.

Google Scholar