The Study on Production Performances of Part Transporter in Flexible Manufacturing System by Using Simulation Method

Article Preview

Abstract:

Material handling is one of major components in Flexible Manufacturing System (FMS). Any improvement of material handling capability is to affect the performance of the whole system. This paper discusses the simulation study on the effect of part arrival rate and dispatching rules to the average waiting time and production rate of the FMS. The facilities of the system were modeled into simulation environment by using Arena Simulation Software. The production parameters such as machine processing times, part transportation speed and type of products were put into the model to represent the behaviors of the real system. Two rules have been considered in the study, i. e. first come first served (FCFS), and shortest processing time (SPT). Average waiting time and productivity were taken into account as performance measures of the system. The result of the study showed that SPT rule gives shorter average waiting time and higher productivity. Based on this result, the SPT rules would be used to control part transporter in order to have a better performance of the FMS.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

714-717

Citation:

Online since:

October 2012

Export:

Price:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] M. P. Groover, Automation, Production Systems, and Computer Integrated Manufacturing, third ed., Pearson International Edition, (2008).

Google Scholar

[2] N. S. Kumar, R. Sridharan, Simulation modelling and analysis of part and tool flow control decisions in a flexible manufacturing system, Robotics and Computer Integrated Manufacturing 25 (2009) 829–838.

DOI: 10.1016/j.rcim.2008.12.004

Google Scholar

[3] I. Um, H. Cheon, H. Lee, The simulation design and analysis of Flexible Manufacturing System with automated guided vehicle system, Journal of Manufacturing System 28 (2009) 115-122.

DOI: 10.1016/j.jmsy.2010.06.001

Google Scholar

[4] Sabil Naqibah Shamsudin Sah, Muhammad Fahezal Ismail, Mohammad Iqbal, Lukman Hakim Omar and Hisham Hamid, Simulation of part transporter for Flexible Manufacturing System, Proceeding of The 3rd International Conference on Engineering Technology. (2011).

Google Scholar

[5] P. H. Koo, J. M. A. Tanchoco, Real time operation and tool selection in single stage multi machine systems. International Journal of Production Research 37-5 (1999) 1023-39.

DOI: 10.1080/002075499191382

Google Scholar